Ontario Clean Water Agency contracted Accuworx to perform a Digester Clean out at the Clarkson Waste Water Treatment plant in Mississauga. An Accuworx team mobilized, complete with a High Powered Vacuum Truck, Confined Space Entry and Rescue Personnel and all associated safety equipment. Our high powered Vacuum Trucks (6400 CFM) the largest of its kind in Canada, performed the clean out in a rapid, safe and efficient manor. Timing was very important, and due to the quick cleaning, OCWA personnel were able to get the digester back on line having minimal disruption to the plant systems.